Project Description
A complete roof replacement was performed on these building, the old EPDM membrane and insulation was removed and replace with new two-inch fiberboards insulation and new TPO (thermoplastic polyolefin) membrane. the challenge on these building was removing all of the roof gravel prior to the new TPO installation. all of the gravel was then reapplied after all of the seams on the new membrane were heat welded with a professional heat welding gun.